| 251 |
RESTRICTION ON PLYING OF SAND LOADED HYVA/TRUCKS THROUGH KATHAJODI RIVER EMBANKMENT IN 42 MOUZA. |
Download(1.58 MB)
|
| 252 |
Publication of Social Impact Assessment Study report on Hadua Irrigation Project, Narsinghpur, Cuttack. |
Download(8.4 MB)
|
| 253 |
Finding of Expert Group on Social Impact Assessment Study Report of Hadua Irrigation Project, Narsinghpur. |
Download(2.58 MB)
|
| 254 |
Notification U/S 4 ( 1) of RFCTLA R & R Act 2013 |
Download(1.41 MB)
|
| 255 |
Notification U/S 4 ( 1) of RFCTLA R & R Act 2013 |
Download(1.41 MB)
|
| 256 |
Defected R.P Cases under Athagarh and Banki Sub-Division listed on 22.03.2022 in the Court of Secretary to RDC(CD), Cuttack for admission. |
Download(1.28 MB)
|
| 257 |
To grant Exclusive Privilege of IMFL ON Shop/Other Hotel (With Lodging) “HOTEL UTKAL GRAND” of Cuttack District for the remaining period of the year,2021-22. |
Download(86.04 KB)
|
| 258 |
Proposed list of Polling Stations/Booths for ULB Election-2022 in respect of NAC, Banki . |
Download(1.26 MB)
|
| 259 |
Proposed list of Polling Stations/Booths for ULB Election-2022 in respect of NAC, Athagarh . |
Download(819.78 KB)
|
| 260 |
Proposed list of Polling Stations/Booths for ULB Election-2022 in respect of Choudwar Municipality. |
Download(1.07 MB)
|